Material Estimating Totals
Coverage calculations for wall tile, floor tile, accents, trim pieces, and sill materials.
| Calculation Point |
Calculated Coverage |
| Net Field Wall Tile Needed | 0 sqft |
| Shower Floor Tile Needed | 0 sqft |
| Accent Tile Needed | 0 sqft |
| Horizontal Deco Strip Tile | 0 sqft |
| Schluter Trim Sticks Needed | 0 pcs |
| 7ft Solid Sill Pieces Needed | 0 pcs |
Financial Tier Allocations
Cost grouping for labor, accessories, base material cost, and applied material sales tax.
| Labor Operations Value | $0.00 |
| System Accessory Upgrades Value | $0.00 |
| Material Base Cost | $0.00 |
| Material Base Sales Tax (7%) | $0.00 |